Time: 90 min  |  PQS rows: HL.VII.2–VII.7

Objectives

For each EOP in GCS §5, state the complete procedure including follow-on steps, reporting requirements, and ops-suspension rules; execute the post-crash sequence in correct priority order.

Outline

  • Each of the 21 EOPs walked from its IA memory steps through checklist completion.
  • The decision boundaries: emergency landing vs. mission abort vs. flight termination.
  • Post-crash in priority order: people, then fire, then documentation, then battery quarantine, then logs — and the do-not-power-on rule.
  • What gets reported, to whom (aviation authority, Draganfly support with the ten most recent logs), and the flight-ops suspension rules the manual imposes.

Outline fidelity for demonstration.