Time: 90 min  |  PQS rows: HL.VII.2–VII.7

Objectives

For each EOP in GCS §5, state the complete procedure including follow-on steps, reporting requirements, and ops-suspension rules; execute the post-crash sequence in the manual’s order.

Outline

  • Each of the 21 EOPs walked from its IA memory steps through checklist completion.
  • The decision boundaries: emergency landing vs. mission abort vs. flight termination.
  • Post-crash in the manual’s sequence (GCS 5.19): emergency stop and confirm disarm, then assess and treat injuries, document the last reported location, approach with caution (battery fire and running propellers are the immediate risks), photograph, manage any fire and contact emergency services, power off, remove and quarantine the batteries, and never power on crashed equipment or payloads.
  • What gets reported, to whom (aviation authority as required; Draganfly support with the ten most recent flight logs after any abnormal occurrence, HL 6.1.6), and the flight-ops suspension rules the manual imposes after an emergency landing or thrust-loss alarm.

Outline fidelity for demonstration.